IDEAL VANGUARD L 170 Installation And Servicing page 19

Hide thumbs Also See for VANGUARD L 170:
Table of Contents

Advertisement

19 cASING ASSEmBLy
Vanguard L 2650
For this boiler model the casing and insulation are contained in
4 cartons.
Assembly of the casing should be carried out in the following
steps:
Refer to diagram below for details.
A. Fit the insulation blanket (1) onto the boiler shell and
secure into place using the elasticated straps (2) provided,
ensuring that the metal clips grip into the external surface of
the insulation.
In order to fit the bulb holders in the upper part of the shell
a cut has to be made.
B. Locate the side panels (3) and (4) with the lower bend
inside the bottom L profiles and the upper bend inside the
upper L profile. The head of the self tapping screw fixed to
the L profile has to coincide with the slot on the bend of the
side panel.
To determine which is the left and right panel ensure that
the cable clamp plate (5) is positioned toward the front
edge.
c. Fit the rear upper panel (6), and fit the plastic cable clamps
(7) to it.
D. Open the combustion chamber door and fit the front
insulation (15), inserting the hinges in the pre-cuts.
E. Fit the 'Ideal' badge to the front edge of the front top panel
(8) and secure with the rubber fixings.
Vanguard L -
Installation & Servicing
INSTALLATIoN
f. Fit the control panel to front top panel (8). Remove the
upper shell of the control panel and insert the capillaries of
thermometer and thermostats through the slots.
G. Insert the thermometer and thermostat bulbs in the bulb
holders as shown in Frame 21 and connect the mains, the
burner, the pump(s) and any equipment to the control panel.
Refit the upper shell of the control panel.
Guide the burner plug through the side cable clamp plate (5)
on the left or right side opposite the burner door hinge and
clamp the cable using the cable clamp supplied.
Fix the side cable clamp plates to the casing side panels.
Fit the cables leaving the boiler from the real panel with the
plastic screws of the cable clamps (7).
H. Position the top panels (9 and 10) and press them against
the side panels.
I. Fit the support (11) positioning it under the rear side of the
top panels (9 and 10).
J. Fit the rear top panels (12 and 13) and press them against
the side panels.
k. Remove the protective paper film from data plate and
ventilation requirement label (14 and 15) and fit them at
the top front corner of the most accessible side panel after
removal of dust from the surface.
Data plate and ventilation requirements labels are in the
plastic bag containing the documents.
van8104
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents