18 cASING ASSEmBLy
Vanguard L 1100 to 2200
For these boiler models the casing and insulation are contained
in 3 cartons.
Assembly of the casing should be carried out in the following
steps:
Refer to diagram below for details
A. Fit the insulation blanket (1) onto the boiler shell and secure
into place using the elasticated straps (2) provided, ensuring
that the metal clips grip into the external surface of the
insulation.
B. Locate the side panels (3) and (4) with the lower bend inside
the bottom L profiles and the upper bend inside the upper
L profile. The head of the self tapping screw fixed to the L
profile has to coincide with the slot on the bend of the side
panel.
To determine which is the left and right panel ensure that the
cable clamp plate (5) is positioned toward the front edge.
c. Open the combustion chamber door and fit the front
insulation (6), inserting the hinges in the precuts.
D. Fit the rear upper panel (7), and fit the plastic cable clamps
(8) to it.
E. Fit the 'Ideal' badge to the front edge of the front top panel
(9) and secure with the rubber fixings.
3b
3a
5
6
18
INSTALLATIoN
10
9
f. Fit the control panel to front top panel (9). Remove the
upper shell of the control panel and insert the capillaries of
thermometer and thermostats through the slots.
G . Insert the thermometer and thermostat bulbs in the bulb
holders as shown in Frame 21 and connect the mains, the
burner, the pump(s) and any equipment to the control panel.
Refit the upper shell of the control panel.
Guide the burner plug through the side cable clamp plate
(5) on the left or right side opposite the burner door hinge
and clamp the cable using the cable clamp supplied.
Fix the side cable clamp plates to the casing side panels.
Fit the cables leaving the boiler from rear panel, with the
plastic screws of the cable clamps (8).
H. Position the top panels (10 and 11) and press them against
the side panels.
I. Remove the protective paper film from data plate and
ventilation requirement label (12 and 13) and fit them at
the top front corner of the most accessible side panel after
removal of dust from the surface.
Data plate and ventilation requirements labels are in the
plastic bag containing the documents.
2
12
13
1
4a 5
11
8
7