6.
Feed in the cables from the wall (e.g. in-wall
box) or from below.
7.
Route the LIN bus cable from the top right-hand
side at the rear from the heat pump and plug into
the control at the bottom.
8.
P ush the control onto the wall-mounted bracket.
9.
Put on the masking plate if applicable
(accessories).
7
Flushing, filling and venting
7.1
Remove the front panel of the
module box
► Unscrew the front panel of the module box.
18
Subject to change without notice | 83057000bUK – Translation into English of the original German operating manual | ait-deutschland GmbH
7.2 Heating water quality
NOTE
● For detailed information refer, among
other things, to the VDI Guidelines
2035
"Vermeidung
Warmwasserheizanlagen"
damage in hot water heating systems).
● Required pH value: 8,2 ... 10
● for
aluminium
8,2 ... 8.5
► Fill the system with deionised heating water
(VE water) only (low-salt operation of the
system).
Advantages of low-salt operation:
●
Low corrosion-promoting properties
●
No formation of mineral scale
●
Ideal for closed heating circuits
●
ideal pH value due to self-alkalinisation after
filling the system
●
If necessary, simple alkalinisation to pH value
8.2 by adding chemicals
7.3 Fill, flush and vent heat source
Water and the following antifreeze products are
approved for filling the brine circuit:
●
Monopropylene glycol
●
Monoethylene glycol
●
Ethanol
●
Methanol
► For operation of the heat source with water or
water-antifreeze mixture, ensure that the water
fulfils the quality specifications of the heating
water side.
► Check that frost protection to –13 °C is ensured.
► Ensure that the antifreeze is compatible with the
pipe, seal and other component materials used
on site.
Drain pipe of the safety valve is connected.
Room is ventilated.
von
Schäden
in
(preventing
materials:
pH
value:
Need help?
Do you have a question about the SWC V Series and is the answer not in the manual?