Timer Removal & Replacement - Quadra-Fire 7100FP-GD-B Owner's Manual

Hide thumbs Also See for 7100FP-GD-B:
Table of Contents

Advertisement

After re-installing the timer assembly through the
firebox access door, re-attach the timer assembly to
the air chamber cover using a Phillips head screw
driver. See Figure 4.19.
Attach the linkage upper arm to the lower linkage
arm.
Figure 4.20 Timer Box Installed
7. Timer Removal & Replacement
Loosen set screw on timer, remove two screws and
remove timer. See Figure 4.21.
Remove
2 screws
Loosen Set Screw
Figure 4.21 Timer
24
Remove Timer
Quadra-Fire • 7100 FP Owner's Manual • 433-3600 • Rev J • 09/21/15
Install new timer using same two screws. It is very
important that the D cut side of the timer shaft is
facing the opposite side of the linkage timer arm.
See Figure 4.22.
D cut side of timer shaft must face
away from the Linkage Timer Arm
Figure 4.22 D Cut on Shaft
Place linkage control arm over timer shaft and tighten
set screw, Figure 4.23.
Tighten set screw
Figure 4.23 Linkage Control Arm Installed
Rotate linkage control arm into final position and
re-attach to mounting plate. Note that the D cut is now
facing the linkage timer arm. Re-attach the linkage
timer arm, Figure 4.23.
Retun to Timer Assembly Replacement, Section
4.B.6.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7100fp-nl-b

Table of Contents