Cable Assembly - NordicTrack GRT500 NTSY09991 User Manual

Table of Contents

Advertisement

Cable Assembly

7. Open the parts bags labeled "CABLE ASSEMBLY"
and "4 PULLEYS." Refer to the Cable Diagram on
page 16 as you assemble the cables.
Identify the High Cable (73), which has a ball on
one end and a bolt on the other end.
Route the bolt end of the High Cable (73) up through
the indicated slot in the Main Upright (3). Feed almost
all of the Cable through the slot.
Slide a 3/8" Flat Washer (55) and a 5/8" x 1/2" Pulley
Bushing (42) onto a 3/8" x 2 1/2" Bolt (54).
Wrap the High Cable (73) around a 4" Pulley (35).
Hold the Pulley inside the indicated slot in the Main
Upright (3). Insert the 3/8" x 2 1/2" Bolt (54) through
the Main Upright and the Pulley.
Slide another 5/8" x 1/2" Pulley Bushing (42) and a
3/8" Flat Washer (55) onto the 3/8" x 2 1/2" Bolt (54).
Tighten a 3/8" Nylon Jamnut (63) onto the Bolt.
8. Remove the upper 3/8" x 3" Bolt (45) from the Top
Frame (1) and the Main Upright (3).
Route the High Cable (73) down through the indicat-
ed slot in the Main Upright (3).
Wrap the High Cable (73) around a 4" Pulley (35) in
the direction shown. Attach the Pulley inside the slot
in the Main Upright (3) with a 3/8" x 2 1/2" Bolt (54),
two 3/8" Flat Washers (55), two 5/8" x 1/2" Pulley
Bushings (42), and a 3/8" Nylon Jamnut (63).
Re-insert the 3/8" x 3" Bolt (45) and secure it with a
3/8" Nylon Locknut (50). Note: The Cable must be
seated in the groove of the Pulley before the Bolt
is attached.
7
Bolt
55
63
42
8
35
Slot
50
1
42
63
55
Bolt
3
8
73
35
Slot
42
Ball
3
45
55
54
42
73
54
55

Advertisement

Table of Contents
loading

Table of Contents