Rack Mounting - Planet POE-2400G User Manual

Ieee 802.3af 12/24-port gigabit power over ethernet managed injector hub
Hide thumbs Also See for POE-2400G:
Table of Contents

Advertisement

2.2.2 Rack Mounting

To install the PoE Injector Hub in a 19-inch standard rack, follow the instructions described below.
Step1: Place your PoE Injector Hub on a hard flat surface, with the front panel positioned towards your front side.
Step2: Attach a rack-mount bracket to each side of the PoE Injector Hub with supplied screws attached to the package.
Figure 2-2-1
shows how to attach brackets to one side of the PoE Injector Hub.
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step3: Secure the brackets tightly.
Step4: Follow the same steps to attach the second bracket to the opposite side.
Step5: After the brackets are attached to the Injector, use suitable screws to securely attach the brackets to the rack, as
shown in
Figure 2-2-2.
Step6: Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network cabling and
supply power to your PoE Injector Hub.
Figure 2-2-1 Brackets attaching to the PoE Injector Hub
Figure 2-2-2 Mounting the PoE Injector Hub in a Rack
User's Manual of POE-1200G / POE2400G
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poe-1200g

Table of Contents