INSTALLATION CHECKLIST
WATER HEATER LOCATION
1.
2.
VENTING
3.
page 22.
4. Ensure the maximum equivalent feet of pipe has not been
page 22.
5.
Requirements on page 22.
6.
7.
GAS SUPPLY AND PIPING
8.
on page 38.
9.
the minimum supply gas line size requirements. See the
CONDENSATE DRAIN
10.
ELECTRICAL CONNECTIONS
11.
12.
TROUBLESHOOTING
SEQUENCE OF OPERATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
54