PRIOR TO START UP
on page 53.
FILLING THE WATER HEATER
1.
2.
3.
4.
SUPPLY GAS LINE PURGING
Fire or Explosion Hazard
Gas line purging is required with new piping or systems in
which air has entered.
To avoid risk of fire or explosion purge discharge must not
enter into confined areas or spaces where ignition can occur.
The area must be well ventilated and all sources of ignition
must be deactivated or removed.
Use only the gas shown on the water heater rating label.
Keep ignition sources away from faucets after extended
periods of non-use.
Read instruction manual before
installing, using or servicing
water heater.
1.
2.
Main Gas Shutoff Valve.
START UP
3.
4.
INITIAL START UP
REQUIRED TEST EQUIPMENT
NOTE:
PREPARATION
1.
2.
3.
4.
5.
6.
7.
8. Open the Main Gas Shutoff Valve.
9.
LIGHTING THE WATER HEATER
1.
2.
3.
4.
5.
50