Download Print this page

GE PRO AIR 107 Service Manual page 50

Split system air conditioner
Hide thumbs Also See for PRO AIR 107:

Advertisement

8.3
Disassembly procedures for outdoor unit 25, 32
Suitable for PRO AIR 109 IN / PRO AIR 109 OUT, PRO AIR 112 IN / PRO AIR 112 OUT
Operation procedures/pictures
Disassembling the top cover
Screw off the one piece of fixing screw that fixes
the handle with screwdriver and push down with
strength to take out the handle.
Screw off the 3 pieces of screws around the top
cover and then lift it upward to take out the top
cover as shown in Fig.8-25.
Disassembling the net cover
Unscrew 4 tapping screws in the screen
enclosure, and remove the screen enclosure as
shown in Fig.8-26.
Disassembling panel
sub-assembly
Unscrew the 5 tapping screws at the valve
support chassis and sideboard of the condenser
to take off panel assembly as shown in Fig.8-27.
Top cover Screw Screw Handle
Screw
Net cover
Panel
Screw
—49—
Fig.8-25
Fig.8-26
Fig.8-27

Advertisement

loading