Download Print this page

GE PRO AIR 107 Service Manual page 48

Split system air conditioner
Hide thumbs Also See for PRO AIR 107:

Advertisement

Operation procedures/pictures
Disassembling the motor and motor support
With a screw driver, screw off the screw fixing
the motor and motor frame to remove the motor
and motor frame as shown in Fig.8-21.
Disassembling capillary
assembly
Weld off the welding spots between the
capillary
assembly
connection and take off the capillary assembly
as shown in Fig. 8-22.
Disassembling valve
With a screw driver, screw off the screw fixing
the valve, and then weld off the connecting pipe
of the valve to remove the valve as shown in
Fig.8-23.
and
other
pipeline
—47—
Motor
Motor bracket
Screw
Capillary
assembly
Valve
Fig. 8-21
Fig. 8-22
Fig.8-23

Advertisement

loading