Download Print this page

GE PRO AIR 107 Service Manual page 43

Split system air conditioner
Hide thumbs Also See for PRO AIR 107:

Advertisement

Operation procedures/pictures
Disassembling the electric box
Firstly screw off 2 screws at the indicator board
and disassemble the indicator board. Then, pull
away the terminals of motor. Screw off grounding
screw and 2 screws fixing the electric box with a
screw driver. Open a latch of the electric box to
remove the electric box. as shown in Fig.8-7, 8-8.
Disassembling evaporator assembly
Firstly use a screwdriver to unscrew the screws in
the rear pipe-clamping bar of evaporator. Remove
the rear pipe clamp bar.
Unscrew the 2 screws at the right side of
evaporator.
Unscrew the screw on the left side of the
evaporator, and loosen the clasp. Turn the
evaporator for a certain angle, and remove the
evaporator as shown in Fig.8-8, 8-9, 8-10, 8-11.
Screw
Indicator board
Screw
Rear pipe
clip board
—42—
Grounding screws Clamp
Fig.8-7
Fig.8-8
Fig.8-9

Advertisement

loading