Commissioning, inspection, maintenance
Further details regarding the individual steps
Returning the primary cylinder into use
1. Reconnect the primary cylinder to
the pipework.
2. Insert new gasket B underneath
flange lid A.
3. Fit the flange lid and tighten the
screws with a maximum torque of
25 Nm.
28
(cont.)
4. Push earth lead C onto tab D.
5. Fit cover E.
6. Fill the primary cylinder with drink-
ing water.