Further details regarding the individual steps
3. Check the system pressure.
Pivoting down the control unit for commissioning and main-
tenance work
1. Open flap D.
2. Turn both screws A down.
3. Release the side closures C and
pivot control unit B forward.
Commissioning, inspection, maintenance
(cont.)
4. Release the side screws and pivot
control unit B down with its retain-
ing frame E.
11