Further details regarding the individual steps
Returning the DHW cylinder into use
A
C
D
H
E
C
B
Commissioning, inspection, maintenance
1. Reconnect the DHW cylinder to the
pipework.
2. Insert new gaskets H underneath
flange lid E or cylinder cap F.
3. Refit flange lid E or cylinder cap
F with stainless steel circular blank
G and tighten with the required tor-
F
que.
■ Cylinder cap: 160 Nm
G
■ Flange lid: 40 Nm
H
4. Fill the DHW cylinder from the DHW
side.
5. If the DHW cylinder is pressurised,
re-tighten the screws on flange lid
E with a torque of 40 Nm.
6. Fit thermometer sensor D, thermal
insulation mats C and hood B or
top panel A.
(cont.)
9