Operation & Service Manual
Installation Evaporator connection
Carrier Transicold Europe
Refrigeration hoses
3. Install fitting and connect the SUCTION PRESSURE LINE
4. Install fitting and connect the HOT GAS LINE hose -with
5. Install fitting and connect the LIQUID LINE (∅8 – module
6. Attach all hoses with plastic tie-wraps.
31/03/07
hose (∅16 – module 12) to outlet of the CPR valve.
red label (∅8 – module 6) to the drain pan serpentin inlet.
6) to the Thermostatic Expansion Valve inlet (through the
heat exchanger).
Viento - Installation/Rev- #34/54