Evaporator - Carrier Viento 200 Operation & Service Manual

Table of Contents

Advertisement

Operation & Service Manual
Installation Box preparation
Carrier Transicold Europe
Drilling

Evaporator

31/03/07
- The drilling depends on the evaporator you
have to install.
- Let a minimum space of 15 cm between the
box wall and the rear of the evaporator.
1. Mark the fixing holes for the evaporator (refer to the
bodybuilder drawing).
If needed, use the fixing material adapted to reinforcement
done by the bodybuilder.
If you don't have reinforcement, you will have to use
mushrooms (refer to section "Mushrooms" page 16).
NOTE :
Viento - Installation/Rev- #12/54

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Viento 300Viento 350

Table of Contents