Installation Evaporator connection
Carrier Transicold Europe
Refrigeration hoses
3 hoses have to be connected to the evaporator :
1. Run hoses and harness through the hole.
2. Prepare hoses as described in section "Unit hoses /
31/03/07
- Suction pressure hose: from the CRP valve outlet
(∅16 – module 12) to the compressor.
- Liquid line hose: from the expansion valve
through the heat exchanger (∅8 – module 6) to the
host unit.
- Hot gas line: from the defrost element inlet
(∅8 – module 6) to the host unit.
- Suction line
- Liquid line
- Hot gas line
- Fan motor wires
- RAT cable
- Injection valve if so equipped
Preparation - p25".
Viento - Installation/Rev- #33/54