Terminal Installation Checklist - Wyse WY-60 Maintenance Manual

Hide thumbs Also See for WY-60:
Table of Contents

Advertisement

Table 3-2
Terminal Installation Checklist
o
Environment
Room temperature is between +40 and +91 degrees
Fahrenheit (5 and 33 degrees Celsius).
Terminal isn't near a magnetic field.
o
Keyboard
Keyboard cable is in the keyboard connector jack on the
left side of the terminal.
Keyboard cable is in the connector jack on the rear of
the
keyboard.
o
AC Power Cord
Female end of the power cord is plugged into the AC
power socket on the rear panel of the terminal.
Male end of the power cord is plugged into wall socket.
o
Communication Interface Cable
One end of the RS-232C interface cable is connected to
the MODEM port on the terminal's rear panel.
The other end of the interface cable is correctly
connected to the computer.
o
Computer Interface
(You'll need to check the computer's
documentation to determine the following information.)
Correct baud rate
Correct stop bits
Correct data bits
Correct parity type
Correct handshaking protocol
3-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents