THIS APPLIANCE SHOULD BE CONNECTED
TO THE GAS SUPPLY ONLY BY A QUALIFIED
GAS SERVICE TECHNICIAN. FOLLOW ALL
LOCAL CODES.
THERE MUST BE A GAS SHUT-OFF BETWEEN
THE STOVE AND THE SUPPLY.
Install ON/OFF Switch - RADVT Series
The switch assembly parts are found in the parts bag.
1. Attach switch assembly to left rear side of stove shroud
(when facing shroud) using two screws and existing
holes in shroud. (Fig. 52)
2. Run wires down back of stove, under bottom of rear
shroud to valve.
3. Attach wires to valve terminals. (Fig. 53)
Switch As-
sembly
Screws
Fig. 52 Attach switch assembly to rear shroud.
SIt Valve
Thermopile
ON/OFF Switch or
Millivolt Thermostat
Fig. 53 Install wiring to switch before connecting to valve.
20306759
Existing
Holes
Valve
ST315
attach switch assy
1/31/00 djt
FP1622
SIT valve w/switch

Thermostat Connection (optional)

Use only a thermostat rated for 500 - 750 millivolts.
Check the table below for the appropriate gauge ther-
mostat wire to use for the length of lead required in your
installation.
Thermostat
Wire / Gauge
18
16
14
1. Install the wall thermostat in the desired location and
run the wires to the stove location. Terminate these
leads with 1/4" female connectors.
2. Connect the thermostat wires to the valve. (Fig. 53)

Receiver Installation - RADVTCS Series

Once the blower is installed to the back of the RADVTCS
Series stove, install the receiver.
1. Slide receiver into igniter bracket as shown in Figure
54.
2. Attach igniter bracket with receiver to valve with #10-
32 x 1/4 screws supplied.
3. Connect receiver wiring to valve as shown on Page
44, Figure 91.
4. Plug igniter wire from burner into the back of the igniter
ST315
bracket.
Receiver installation complete.
FP1622
ST1121
Fig. 54 Install receiver.
Radiance
Direct Vent Gas Heater
®
Maximum Run
20 feet
20 - 40 feet
up to 60 feet
Valve
ST1121
receiver install
Receiver
Igniter
Bracket
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents