Field Service Ver. 1.0 Aug. 2005
7.3.23
Operation Board
1. Remove the Operation Panel.
56
[1]
[3]
[5]
[8]
[7]
[11]
[10]
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500
[3]
[4]
[2]
4040F2C758DA
[6]
4040F2C759DA
[7]
4040F2C760DA
[9]
4040F2C761DA
2. Disconnect two connectors [1] and
remove three flat cables [2]
3. Remove two screws [3] and the
Operation Board 1 [4].
4. Remove two screws [5] and the
Bracket [6].
5. Remove ten screws [7] and the
Operation Key Board 1 [8].
6. Remove two screws [9], connector
[10], and the Operation Key Board 2
[11].
7. Other
69