15 Reports

15.1 Start-up report

Enter your signature and the date after completing the start-up activities.
Start-up activities
1.
Check for gas leaks
2.
Fill the heating system
– Pre-pressure expansion vessel (refer to the installation
instructions for the expansion vessel)
– Heating system filling pressure
3.
Fill the condensate trap with water
4.
Write down the gas characteristics:
5.
Bleed the gas supply valve
6.
Check the air/flue gas connection
7.
Checking the appliance configuration
8.
Measure the gas inlet pressure (working pressure)
9.
Check and adjust the gas/air ratio
10. Carry out a leakage test in operating conditions
11. Measure the flue gases CO emissions
12. Carry out a function test
-
Measure the ionization current
12. Measure the pH-value
13. Boiler settings
14. Final activities
-
Close the boiler door and the control panel
-
Hand over
Confirming proper start-up
Logamax plus GB162-80 kW/100 kW - Subject to modifications resulting from technical improvements!
Page
Measurement results
46
47
____________ psi
____________ psi
48
Heat input
____________ btu/ft³
Heat output
____________ btu/ft³
49
49
50
50
____________ inch W.C.
52
____________ inch W.C.
54
55
____________ ppm
56
____________ μA
56
Fill in the record book
58
60
Remarks
Company stamp/signature/date
Reports
15