16.1 Start-up report

Put your signature and the date at the bottom of the start-up
report.
Start-up activities
1. Fill the heating system and check that all connections are tight
– Inlet pressure of expansion tank (observe the Installation Instructions
for the expansion tank)
– Pressurize the system
– Fill the condensate trap
2. Carry out a gas tightness test
3. Note down the gas characteristics:
4. Convert the boiler to another type of gas supply (only if allowed)
5. Vent the gas supply conduit
6. Check the combustion air/flue gas connection
7. Measure the gas connection pressure (flow pressure)
8. Check and adjust the gas/air ratio
9. Measure the carbon monoxide content (CO)
10. Check and if necessary adjust the carbon monoxide content (CO
11. Measuring the ionization current
12. Make the necessary settings on the thermostat
13. Carry out function testing
14. Fitting the casing
15. Inform the owner; hand over the technical documents
Confirm proper start-up
Buderus • http://www.buderus.net
58
Page
Wobbe index
Operating heat value
)
2
We reserve the right to make any changes due to technical modifications!
Installation instructions Logamax plus GB142-24/30/45/60 • version 10/2007
Measured values
30
30
__________ psi
30
__________ psi
30
30
30
__________ kWh/m³
__________ kWh/m³
52
32
32
33
________ inch W.C.
34
________ inch W.C.
36
__________ ppm
__________ %
37
__________ µA
39
36
38
38
Company stamp/signature/date
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents