15.3 Service report
Indicate the maintenance activities that have been
carried out, enter the values measured and enter your
signature and the date.
Needs-dependant maintenance
activities
1. Clean the heat exchanger, burner and
condensate trap
2. Check and adjust the gas/air ratio
– CO
content at full load
2
– CO
content at part load
2
3. Function check
4. Confirming proper maintenance
Logamax plus GB162-80 kW/100 kW - Subject to modifications resulting from technical improvements!
Page Date:
Date:
_______
_______
66
52
_______
_______
inch W.C.
inch W.C.
______ %
______ %
______ %
______ %
71
Company
Company
stamp/
stamp/
signature
signature
Date:
Date:
Date:
_______
_______
_______
_______
_______
_______
inch W.C.
inch W.C.
inch W.C.
______ %
______ %
______ %
______ %
______ %
______ %
Company
Company
Company
stamp/
stamp/
stamp/
signature
signature
signature
Reports
15
Date:
Date:
_______
_______
_______
_______
inch W.C.
inch W.C.
______ %
______ %
______ %
______ %
Company
Company
stamp/
stamp/
signature
signature
87