Servicing And Maintenance Logs - Buderus Logano G115 WS US/CA Installation And Service Instructions Manual

Low-temperature oil boiler
Hide thumbs Also See for Logano G115 WS US/CA:
Table of Contents

Advertisement

8.6

Servicing and maintenance logs

V Initial and date the servicing operations completed.
Service work
1.
Check general condition of heating system
2.
Visual inspection and function check of the heating
system
3.
Checking fuel and water-carrying components of the
system for:
– leaks during operation
– leak test
– visible signs of corrosion
– signs of ageing
4.
Check the combustion chamber and the heating sur-
face for contamination; shut down the system for this
step
5.
Checking the burner (
6.
Check the combustion air supply and flue gas routing
for function and safety
7.
Check the operating pressure, relief valve and expan-
sion tank inlet pressure
8.
Checking function of DHW tank and sacrificial anode
(
DHW tank documentation)
9.
Checking controls settings (
tion)
10. Record the final checks of the inspection work, incl.
measurements and test results
Confirmation of properly completed servicing
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
burner documentation)
controls' documenta-
Heating system servicing
The inspection and servicing logs can also be used as
copy masters.
Page Date:______
34
37
Company
stamp/signa-
ture
Date:______
Date:______
Company
Company
stamp/signa-
stamp/signa-
ture
ture
8
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano g115/3 wsLogano g115/4 wsLogano g115/5 ws

Table of Contents