Powerware BPIV Installation & Operation Manual page 48

10–15 kva/20–30 kva
Table of Contents

Advertisement

8.
If permanently mounting the system, proceed to step 15; otherwise, proceed to
step 9.
9.
Secure the new Battery cabinet in position by lowering the leveling feet, until
cabinet is not resting on the casters and the cabinet is level.
10.
Secure the front of Battery cabinets by sliding the angle grounding/mounting
bracket, from installation kit, behind the base of the Battery cabinets with the
bottom angle facing outward (see Figures 2---7 or 2---9). Use hardware
provided in the kit to secure the bracket.
11.
Remove the top side panel mounting screw (tie/grounding bracket location in
Figures 2---7 or 2---9) from both the Battery cabinets.
12.
Secure the back of Battery cabinets with the tie/grounding bracket. Secure the
bracket with the side panel mounting screws.
13.
Install side panel removed from the previously installed Battery cabinet to the
right side of the new Battery cabinet. Secure with screws removed from
Battery cabinet.
14.
When all wiring is complete, proceed to Chapter 3 and connect battery strings
in accordance with instructions contained in paragraph 3.4.2.
15.
Using retained hardware, reinstall shipping brackets previously removed to
front and rear of new Battery cabinet with the angle facing outward.(see
Figures 2---8 or 2---10).
16.
Secure the front of Battery cabinets with the long flat grounding/mounting
bracket from the installation kit (see Figures 2---8 or 2---10). Use hardware
provided in the kit to secure the bracket.
17.
Remove the top side panel mounting screw (tie/grounding bracket location in
Figures 2---8 or 2---10) from both the Battery cabinets.
18.
Secure the back of Battery cabinets with the tie/grounding bracket. Secure the
bracket with the side panel mounting screws.
19.
Install side panel removed from the previously installed Battery cabinet to the
right side of the new Battery cabinet. Secure with screws removed from
Battery cabinet.
20.
Secure cabinets to floor with contractor supplied hardware.
21.
When all wiring is complete, proceed to Chapter 3 and connect battery strings
in accordance with instructions contained in paragraph 3.4.2.
22.
Repeat steps 1 through 21 to join additional Battery cabinets.
2--22
Powerware BPIV (10 kVA- -30 kVA) Installation and Operation
164201406 Rev. C 013004

Advertisement

Table of Contents
loading

Table of Contents