Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at their own expense. Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV. B 101503...
Page 7
Path of Current Through the Parallel System in Battery Mode . . . 3---6 Figure 4---1. BPIV 15 kVA and 30 kVA Parallel Cabinet Indicators ... . 4---3 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV. B 101503...
Page 8
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV. B 101503...
Introduction The Powerware BPIV Parallel System can be utilized to prevent loss of valuable electronic information, minimize equipment downtime, and/or minimize the adverse effect on equipment and production due to unexpected power problems. The Powerware BPIV Parallel System continually monitors incoming electrical power and removes the surges, spikes, sags, and other irregularities that are inherent in commercial utility power.
Each component of your Parallel System is housed in a free-standing cabinet. The cabinets line up and match in style and color, and have safety shields behind the doors for hazardous voltage protection. The following illustration depicts the Powerware BPIV Parallel Cabinet.
UPMs to ensure trouble-free operation. In particular, you should be thoroughly familiar with the Remote Emergency Power Off procedure described in the Powerware BPIV UPS Installation and Operation manual referenced at the end of this section.
• Ensure the area around the Parallel System is clean and uncluttered. • Observe all DANGER, CAUTION, and WARNING notices affixed to the inside and outside of the equipment. Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV. B 101503...
Also described are the communications capabilities of the UPS system and remote notification. Contact your local Powerware Field Service office for information on how to obtain copies of this manual. Getting Help If you need to schedule initial startup, need regional locations and telephone numbers,...
Page 14
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV. B 101503...
The operating environment must meet the weight, airflow, size and clearance, requirements specified in Appendix A. Powerware BPIV Parallel Cabinet Installation and Operation 1--1 164201409 REV. B 101503...
For external wiring requirements, including the minimum AWG size of external wiring, refer to Tables A through E in Appendix A for the Powerware BPIV 15 kVA Parallel Cabinet or Tables F through J in Appendix A for the Powerware BPIV 30 kVA Parallel Cabinet.
Use a forklift or other material handling equipment to move the cabinet to a convenient unpacking area. Insert the forklift jacks between the pallet supports on the bottom of the unit. Powerware BPIV Parallel Cabinet Installation and Operation 1--3 164201409 REV. B...
Page 20
After removing the protective covering, inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading. If damage has occurred or shortages are evident, contact the Powerware Customer Service Department immediately to determine the extent of the damage and its impact upon further installation.
Drawing 164201409---2 and Table Q in Appendix A identify the control wiring terminations. UPM Cabinet Installation To install the UPMs, refer to the Powerware BPIV UPS Installation and Operation manual referenced in the Introduction to this manual. Powerware BPIV Parallel Cabinet Installation and Operation 2--1 164201409 REV.
To install a Parallel Cabinet, perform the procedures in the following paragraphs. 2.3.1 Unloading the Powerware BPIV Parallel Cabinet from the Pallet The Parallel Cabinet is bolted to a wooden pallet supported by wood skids. To remove the pallet, perform the following procedure: WARNING: The Parallel Cabinet is heavy.
Page 23
VENTED FRONT PANEL SHIPPING PALLET BOLTS (2) SHIPPING BOLTS (1) FRONT SHIPPING BRACKET (3) FRONT VIEW Figure 2 ---1. Removing Front Shipping Bracket --- Powerware BPIV Parallel Cabinet Powerware BPIV Parallel Cabinet Installation and Operation 2--3 164201409 REV. B 101503...
2.3.2. 2.3.2 Installing Parallel Cabinet External Power Wiring Remove front vented panel from the Powerware BPIV Parallel Cabinet. Front panel is secured with magnetic latches and is removed by pulling panel straight forward to disengage magnetic latches (see Figure 2---1).
Page 26
Locate CAN and Building Alarm 4 terminals by referring to drawings 164201409---2 and 164201409---6 in Appendix A of this manual. For connections to the UPMs, refer to Chapter 2 and Appendix A in the Powerware BPIV UPS Installation and Operation manual referenced in the Introduction to this manual.
Installation Checklist to be sure you have completed all applicable equipment installation. NOTE: The Installation Checklist MUST be completed prior to starting the Parallel System for the first time. Powerware BPIV Parallel Cabinet Installation and Operation 2--7 164201409 REV. B 101503...
A 120VAC service outlet is located within 25 feet of the UPMs and Parallel equipment. Building alarms are wired appropriately. Startup and operational checks performed by authorized service personnel. Powerware BPIV Parallel Cabinet Installation and Operation 2--8 164201409 REV. B...
System Operation Looking Inside the Parallel System The Parallel Cabinet extends the normal operation of the Powerware BPIV UPS units by offering parallel capacity/redundant capability. The Parallel system continues to maintain power to the critical loads during commercial electrical power brownout, blackout, overvoltage, undervoltage, and out-of-tolerance frequency conditions.
UPMs ensures that operating mode changes are automatic and transparent to the critical load. The following descriptions provide the differences in Parallel System operating modes. Powerware BPIV Parallel Cabinet Installation and Operation 3--2 164201409 REV. B 101503...
If the UPMs become overloaded or unavailable, the Parallel System switches to Bypass mode. The Parallel System automatically returns to Normal mode when the overload condition is cleared and system operation is restored within specified limits. Powerware BPIV Parallel Cabinet Installation and Operation 3--3 164201409 REV. B 101503...
Figure 3 ---2. Path of Current Through the Parallel System in Bypass Mode CAUTION: The critical load is not protected while the Parallel Cabinet is in Bypass mode. Powerware BPIV Parallel Cabinet Installation and Operation 3--4 164201409 REV. B 101503...
Page 37
Bypass mode is a normal operating mode, and not an alarm condition. However, if the Parallel System is unable to return to Normal mode following an automatic transfer to Bypass mode, an alarm condition is recorded. Powerware BPIV Parallel Cabinet Installation and Operation 3--5 164201409 REV. B...
The UPMs will remain in this operating mode until the input power to the rectifier is again within the specified voltage or frequency acceptance windows. Powerware BPIV Parallel Cabinet Installation and Operation 3--6 164201409 REV. B...
Page 39
The greater the load, the less support time the battery will have. Decrease the load, and the battery support time will generally increase. Powerware BPIV Parallel Cabinet Installation and Operation 3--7 164201409 REV. B 101503...
Page 40
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation 3--8 164201409 REV. B 101503...
Observe all DANGER, CAUTION, and WARNING notices affixed to the inside and outside of the equipment. • Always conform to the more detailed safety precautions described in “Important Safety Instructions” section of Chapter 6. Powerware BPIV Parallel Cabinet Installation and Operation 4--1 164201409 REV. B 101503...
Stop and refer to the Operator’s Manual for more information. RISK OF ELECTRIC SHOCK There is a risk of electric shock present, and you should observe associated warnings. The UPS contains high voltages. Powerware BPIV Parallel Cabinet Installation and Operation 4--2 164201409 REV. B 101503...
ON BYPASS --- Parallel System is on Bypass. NORMAL OPERATION ON BYPASS PARALLEL CABINET Figure 4 ---1. Powerware BPIV 15 kVA and 30 kVA Parallel Cabinet Indicators Powerware BPIV Parallel Cabinet Installation and Operation 4--3 164201409 REV. B 101503...
Operation The following procedures provide instructions for operating the Parallel System. Refer to the Powerware BPIV UPS Installation and Operation manual referenced in the Introduction to this manual, for UPM operating instructions. NOTE: Before starting the Parallel System ensure all installation tasks are complete and a preliminary startup has been performed by authorized service personnel.
Observe monitor screens on all UPMs becoming active as an indication of logic power. Press the System Control pushbutton on any UPM. The System Control screen appears on each UPM. Powerware BPIV Parallel Cabinet Installation and Operation 4--5 164201409 REV. B 101503...
The Parallel System is now operating in the Normal mode and the NORMAL status indicator is illuminated. The UPM PPU status indicates ONLINE and the critical load is protected from commercial power interruptions and abnormalities. Powerware BPIV Parallel Cabinet Installation and Operation 4--6 164201409 REV. B 101503...
If it is necessary to isolate the UPM from the critical bus, contact Customer Service (refer to Getting Help in the Introduction to this manual). Powerware BPIV Parallel Cabinet Installation and Operation 4--7 164201409 REV. B...
The rectifier and inverter turn on. When the inverter reaches full voltage, the UPM synchronizes with the output and closes the output contactor. The UPM is online, in parallel with the other system UPMs. Powerware BPIV Parallel Cabinet Installation and Operation 4--8 164201409 REV. B...
Power is present inside the UPM cabinets due to internal batteries. Open all UPM input and bypass (if dual feed) feeder circuit breakers. Open the Parallel Cabinet bypass input feeder circuit breaker. Load is now de-energized. Powerware BPIV Parallel Cabinet Installation and Operation 4--9 164201409 REV. B 101503...
Do not attempt to restart the system after Load Off until the cause of the shutdown has been identified and cleared. To restart the UPM after pressing the LOAD OFF pushbutton, follow the procedure in paragraph 4.4.6. Powerware BPIV Parallel Cabinet Installation and Operation 4--10 164201409 REV. B 101503...
NOTE: The following instructions are for the Powerware supplied REPO switch. If a customer supplied REPO switch is used it may not activate in the same manner.
Page 52
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation 4--12 164201409 REV. B 101503...
(For descriptions of the Parallel cabinet status indicators refer to Chapter 4 “Parallel System Operating Instructions”, and for descriptions of the UPM status indicators, refer to “Using the Control Panel” in the Powerware BPIV UPS Installation and Operation manual referenced in the Introduction to this manual.)
Check Boost OK HA Condition Cleared Check CSB Setup HA Service Required Check CSB Setup OK HA Condition Cleared Check Inverter HA Service Required Check Inverter OK HA Condition Cleared Powerware BPIV Parallel Cabinet Installation and Operation 5--2 164201409 REV. B 101503...
Page 55
Gate Driver Failed 1 HA Service Required Gate Driver Failed 1 OK HA Condition Cleared Heat Sink Thermistor Failure HA Service Required Heat Sink Thermistor Failure OK HA Condition Cleared Powerware BPIV Parallel Cabinet Installation and Operation 5--3 164201409 REV. B 101503...
Page 56
HA Condition Cleared Output Phase Rotation HA User Action Required Output Phase Rotation OK HA Condition Cleared Parallel Setup Error Service Required Parallel Setup Error OK Condition Cleared Powerware BPIV Parallel Cabinet Installation and Operation 5--4 164201409 REV. B 101503...
Page 57
Warning: Battery Time is Low OK HA Condition Cleared Table Key To Log Column HA --- Event recorded in History and Active Logs. --- Event recorded in Active Log only. Powerware BPIV Parallel Cabinet Installation and Operation 5--5 164201409 REV. B 101503...
Page 58
HA Information Only Call Phone # 4 Clear HA Condition Cleared Calling Unsuccessful Information Only Calling Phone #1 HA Information Only Calling Phone #1 OK HA Condition Cleared Powerware BPIV Parallel Cabinet Installation and Operation 5--6 164201409 REV. B 101503...
Page 59
Phone #2 Failed Information Only Phone #3 Failed Information Only Phone #4 Failed Information Only SBM IO 1 Not Reporting Information Only SBM IO Not Reporting OK Condition Cleared Powerware BPIV Parallel Cabinet Installation and Operation 5--7 164201409 REV. B 101503...
Page 60
UPS MOB Open OK Condition Cleared System Not Redundant Table Key To Log Column HA --- Event recorded in History and Active Logs. --- Event recorded in Active Log only. Powerware BPIV Parallel Cabinet Installation and Operation 5--8 164201409 REV. B 101503...
Page 61
UPS Power Supply OK HA Service Status Table Key To Log Column HA --- Event recorded in History and Active Logs. --- Event recorded in Active Log only. Powerware BPIV Parallel Cabinet Installation and Operation 5--9 164201409 REV. B 101503...
Page 62
Load Off Normal Mode PPU On PPU Off Table Key To Log Column HA --- Event recorded in History and Active Logs. --- Event recorded in Active Log only. Powerware BPIV Parallel Cabinet Installation and Operation 5--10 164201409 REV. B 101503...
Regular routine checks of operation and system parameters will enable your system to function efficiently for many trouble-free years. NOTE: Refer to the Powerware BPIV UPS Installation and Operation Manual, referenced in the Introduction to this manual, for UPM maintenance.
Page 64
Suivre les précautions qui s’imposent. • Pour le remplacement, utiliser le même nombre et modéle des batteries. • L’élimination des batteries est règlementée. Consulter les codes locaux à cet effet. Powerware BPIV Parallel Cabinet Installation and Operation 6--2 164201409 REV. B 101503...
Maintenance Training A basic training course, available from Powerware, gives you a competent working knowledge of the Parallel System operation and teaches you how to perform first level corrective maintenance. For more information about training and other services, contact the Powerware Training Coordinator in Raleigh, North Carolina, or call Powerware field service at 1 -- 800 -- 843 -- 9433.
Page 66
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation 6--4 164201409 REV. B 101503...
Model 30 kVA (2 Capacity/0 Redundant): 166.6 Amps Model 30 kVA (2 Capacity/1 Redundant): 166.6 Amps Model 30 kVA (3 Capacity/0 Redundant): 249.9 Amps Model 30 kVA (3 Capacity/1 Redundant): 249.9 Amps Powerware BPIV Parallel Cabinet Installation and Operation 7--1 164201409 REV. B 101503...
Electrostatic Discharge (ESD) Meets IEC 801---2 specifications. Withstands up Immunity to 25 kV pulse without damage and with no disturbance or adverse effect to the critical load. Powerware BPIV Parallel Cabinet Installation and Operation 7--2 164201409 REV. B 101503...
Parallel Cabinet • 164201409---5 Oneline Drawings of Parallel System • 164201409---6 Location of Parallel Cabinet Terminals Powerware BPIV 15 kVA and 30 kVA • 164201409---7 Parallel Cabinet Controls and Indicators • 164201409---8 Parallel Cabinet Dimensions Powerware BPIV 15 kVA and 30 kVA...
Page 70
UPM disconnect switches must be wired in order starting with UPM 1 (e.g., UPM 1 wired to UPM disconnect switch 1). DESCRIPTION: POWER WIRING INSTALLATION NOTES NOTE: Callout letter DRAWING NO: SHEET: map to drawing #164201409---5 164201409---1 1 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---2 164201409 REV. B 101503...
Page 71
Minimum conductor size (number per ) DESCRIPTION: POWER WIRING INSTALLATION NOTES NOTE: Callout letter DRAWING NO: SHEET: map to drawing #164201409---5 164201409---1 2 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---3 164201409 REV. B 101503...
Page 72
Minimum conductor size (number per ) DESCRIPTION: POWER WIRING INSTALLATION NOTES NOTE: Callout letter DRAWING NO: SHEET: map to drawing #164201409---5 164201409---1 3 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---4 164201409 REV. B 101503...
Page 73
Minimum conductor size (number per ) DESCRIPTION: POWER WIRING INSTALLATION NOTES NOTE: Callout letter DRAWING NO: SHEET: map to drawing #164201409---5 164201409---1 4 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---5 164201409 REV. B 101503...
Page 74
Minimum conductor size (number per ) DESCRIPTION: POWER WIRING INSTALLATION NOTES NOTE: Callout letter DRAWING NO: SHEET: map to drawing #164201409---5 164201409---1 5 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---6 164201409 REV. B 101503...
Page 75
Minimum conductor size (number per ) DESCRIPTION: POWER WIRING INSTALLATION NOTES NOTE: Callout letter DRAWING NO: SHEET: map to drawing #164201409---5 164201409---1 6 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---7 164201409 REV. B 101503...
Page 76
Table M and N for conduit requirements. Drawing 164201409---6 shows the location of the power cable terminals inside the Parallel Cabinet. Table K. Powerware BPIV Parallel Cabinet Power Cable Terminations 15 kVA 1+1, 2+0, 2+1, 3+0, and 3+1 Configuration...
Page 77
AC Input to Bypass (A, B, C, Neut, Gnd) Output (A, B, C, Neut, Gnd) DESCRIPTION: POWER WIRING INSTALLATION NOTES DRAWING NO: SHEET: 164201409---1 8 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---9 164201409 REV. B 101503...
Page 78
AC Input to Bypass (A, B, C, Neut, Gnd) Output (A, B, C, Neut, Gnd) DESCRIPTION: POWER WIRING INSTALLATION NOTES DRAWING NO: SHEET: 164201409---1 9 of 11 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---10 164201409 REV. B 101503...
Page 79
Table O in accordance with the National Electrical Code, ANSI/NFPA 70. DESCRIPTION: POWER WIRING INSTALLATION NOTES DRAWING NO: SHEET: 164201409---1 10 of 11 REVISION: DATE: 061502 Powerware BPIV Parallel Cabinet Installation and Operation A ---11 164201409 REV. B 101503...
Page 80
225A BPIV ---30 (2+1) 350A BPIV ---30 (3+0) 350A BPIV ---30 (3+1) DESCRIPTION: POWER WIRING INSTALLATION NOTES DRAWING NO: SHEET: 164201409---1 11 of 11 REVISION: DATE: 061502 Powerware BPIV Parallel Cabinet Installation and Operation A ---12 164201409 REV. B 101503...
Refer to Tables Q and to Chapter 2, paragraph 2.3.3 of this manual for Parallel Cabinet customer interface wiring. Refer to the Powerware BPIV UPS Installation and Operation manual, referenced in the Introduction to this manual, for customer interface terminal locations in the UPMs.
Page 82
UPMs and the Parallel Cabinet can be placed in any physical order, but must be DRAWING NO: SHEET: 164201409---2 2 of 2 wired in the order shown in the drawing. REVISION: DATE: 061502 Powerware BPIV Parallel Cabinet Installation and Operation A ---14 164201409 REV. B 101503...
Page 83
0---40˚C (32---104˚F) Recommended Operating Range: 20---25˚C (68---77˚F) Maximum Relative Humidity: 95%, non-condensing DESCRIPTION: PHYSICAL FEATURES AND REQUIREMENTS DRAWING NO: SHEET: 164201409---3 1 of 1 REVISION: DATE: 061502 Powerware BPIV Parallel Cabinet Installation and Operation A ---15 164201409 REV. B 101503...
Page 84
Powerware BPIV Parallel Cabinet DESCRIPTION: PARALLEL CABINET DRAWING NO: SHEET: 164201409---4 1 of 1 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---16 164201409 REV. B 101503...
Page 85
ONELINE DRAWINGS OF PARALLEL SYSTEM the same source. DRAWING NO: SHEET: 164201409---5 1 of 3 2. A bypass neutral feeder must be REVISION: DATE: supplied. 061502 Powerware BPIV Parallel Cabinet Installation and Operation A ---17 164201409 REV. B 101503...
Page 86
DESCRIPTION: ONELINE DRAWINGS OF PARALLEL SYSTEM the same source. DRAWING NO: SHEET: 2 of 3 164201409---5 2. A bypass neutral feeder must be supplied. REVISION: DATE: 061502 Powerware BPIV Parallel Cabinet Installation and Operation A ---18 164201409 REV. B 101503...
Page 87
ONELINE DRAWINGS OF PARALLEL SYSTEM the same source. DRAWING NO: SHEET: 164201409---5 3 of 3 2. A bypass neutral feeder must be REVISION: DATE: 061502 supplied. Powerware BPIV Parallel Cabinet Installation and Operation A ---19 164201409 REV. B 101503...
Page 88
PHASE B (E2) FROM PHASE C (E3) UPM 3 NEUTRAL (E12) LEFT VIEW DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 1 of 8 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---20 164201409 REV.
Page 89
PHASE B (E2) PHASE C (E3) FROM UPM 4 NEUTRAL (E12) RIGHT VIEW DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 2 of 8 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---21 164201409 REV.
Page 90
(A, B, C, N) (SEE SHEET 5 AC OUTPUT TO FOR DETAILS) CRITICAL LOAD (A, B, C, N) DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 3 of 8 REVISION: DATE: 101503...
Page 91
(A, B, C, N) (SEE SHEET 6 AC OUTPUT TO FOR DETAILS) CRITICAL LOAD (A, B, C, N) DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 50 kVA DRAWING NO: SHEET: 164201409---6 4 of 8 REVISION: DATE: 101503...
Page 92
15 kVA 1+1, 2+0, 2+1, 3+0, and 3+1 Configuration 30 kVA 1+1, 2+0, and 2+1 Configurations INPUT/OUTPUT TERMINAL BLOCK NEUTRAL (3E12) DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 5 of 8 REVISION: DATE:...
Page 93
PARALLEL CABINET POWER TERMINALS 30 kVA 3+0, and 3+1 Configurations INPUT/OUTPUT TERMINAL BLOCK NEUTRAL (3E12) DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 6 of 8 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---25 164201409 REV.
Page 94
REAR ENTRY CONDUIT LANDING FOR BYPASS INPUT AND LOAD OUTPUT CONNECTIONS (REMOVE PANEL TO DRILL OR PUNCH CONDUIT HOLES.) DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 7 of 8 REVISION: DATE:...
Page 95
FRAME GROUND INTERFACE WIRING WIREWAY CUSTOMER INTERFACE TERMINALS (TB2) TOP VIEW DESCRIPTION: LOCATION OF PARALLEL CABINET TERMINALS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---6 8 of 8 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---27 164201409 REV.
Page 96
An illuminated LED represents a condition where a service disconnect switch is open and should not be closed. These switches are not customer accessible and a qualified service representative must be contacted to perform corrective action. To schedule a service call, contact Powerware Customer Service. DESCRIPTION: PARALLEL CABINET...
Page 97
An illuminated LED represents a condition where a service disconnect switch is open and should not be closed. These switches are not customer accessible and a qualified service representative must be contacted to perform corrective action. To schedule a service call, contact Powerware Customer Service. DESCRIPTION: PARALLEL CABINET...
Page 98
PARALLEL CABINET DESCRIPTION: PARALLEL CABINET DIMENSIONS POWERWARE BPIV 15 kVA and 30 kVA DRAWING NO: SHEET: 164201409---8 Dimensions are in millimeters and [inches] 1 of 2 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---30 164201409 REV. B...
Page 99
PARALLEL CABINET Dimensions are in millimeters and [inches] DESCRIPTION: PARALLEL CABINET DIMENSIONS POWERWARE BPIV DRAWING NO: SHEET: 164201409---8 2 of 2 REVISION: DATE: 101503 Powerware BPIV Parallel Cabinet Installation and Operation A ---31 164201409 REV. B 101503...
Page 100
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation A ---32 164201409 REV. B 101503...
All parts requiring replacement for the Factory Warranty period. If, in the opinion of Powerware, the Unit fails to meet published specifications and the defect is within the terms of this warranty, the Unit will be repaired or replaced at the option of Powerware with no charge for replacement parts. Labor required, to make...
Page 102
This Page Intentionally Left Blank. Powerware BPIV Parallel Cabinet Installation and Operation W--2 164201409 REV. B 101503...