Checking The Condensate Drain Pipe; Visual Inspection Of Appliance; Checking The Gas Supply Pressure; Water Inhibitor Concentration - Biasi Inovia 25C User Manual And Installation Instructions

Inovia series wall hung, fanflue, roomsealed, high efficiency gas boiler
Table of Contents

Advertisement

The values in the tables are measured at the
nominal useful power with factory calibration.
9.12 Checking the condensate drain
pipe
The condensate drain pipe 40 (Fig. 9.19) does
not require any particular maintenance but
just check:
• That no solid deposits have formed, if so re-
move them.
• That the condensate drain piping is not
clogged.
Unscrew the plug to clean inside the pipe.
Fig. 9.19

9.13 Visual inspection of appliance

Visually inspect all water joints, seals and
connections for any evidence of leakage and
retighten, grease or replace them as neces-
sary.
9.14 Checking the gas supply pres-
sure
Check appliance for gas tightness.
Recheck operational pressures as described
in section "Checking the gas supply pressure"
MAINTENANCE
to page 64 of this manual.

9.15 Water inhibitor concentration

Where chemical products are used the level
of water treatment should be checked on an
annual basis and re treated after full or partial
drain down.
A conductivitymeter can be used to check the
correct concentration of inhibitor in the heat-
ing water.
9.16 Setting the boiler chimney
With the boiler set in chimney sweep mode, it
is possible to exclude some boiler automatic
functions making check and control opera-
tions easier.
40
• Enter in "programming mode" by pressing
keys 14 - 17 - 18 (Fig. 9.20) for 10 seconds
at the same time until the letters P01 are
displayed on the LCD display, indicating that
"parameter 01" (Fig. 9.21) has been acti-
vated.
11
12
13
Fig. 9.20
sweep function
14 15
19
18
17
16
- 85 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inovia 35cInovia 30c

Table of Contents