Preparation For Operation - Omron BN75R Instruction Manual

Table of Contents

Advertisement

Procedure from installation to operation
Read "Safety precautions"
Page v
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 5
Are you
using UPS monitoring
software or contact
signal?
No
Check the operation and
displays Pages 15
Charge the battery
Page 25
Measure the backup time
Page 34
Charge the battery again
Page 25
* Preparation for operation is
complete.
Operate Page 24
Perform maintenance
and inspection Page 36
Replace the battery
Page 37
Start
Yes
Read "Using the UPS
monitoring software and
contact signal" Page 43
No
Deteriorated
battery?
Yes
Installation/connection

Preparation for operation

Maintenance/
inspection
iii