Do not overload the AC supply branch circuit that provides power to the rack. The total
rack load should not exceed 80 percent of the branch circuit rating.
Ensure that proper airflow is provided to components in the rack.
Do not step on or stand on any component when servicing other components in a rack.

Installation checklist

#
1
Verify that all equipment is
on site
2
Verify that rack is installed to
code
3
Verify that rack is grounded
per local code
4
Remove cabinet doors, if
necessary
5
Marking the rack
20
6
Attaching rails to the server
on page 21
7
Attaching the rails to the
rack
8
Installing the server in the
rack
9
Replace the cabinet doors, if
necessary
10
Powering up the server
page 24
11
Troubleshoot the installation
Installing the Avaya S8510 Server Family and Its Components
Task
on page
on page 22
on page 23
on
Notes
Compare the list of items that were
ordered to the contents of the boxes.
Use the inventory list provided by
your project manager; do not rely on
the packing slips inside the boxes for
the correct information.
See Approved Grounds (555–245–
772)
See cabinet manufacturer's
documentation.
See cabinet manufacturer's
documentation.
Installation checklist
May 2008
19