Chapter 2
Installing the Model 5399 Remote Access Concentrator Module
Testing the Installation
Nortel Networks 5399 Access Switch Hardware Installation Guide
2-10
After installing and connecting the Remote Access Concentrator, verify
that you have performed the installation correctly by observing the LED
indicators and system operation displays on the front panel of the Remote
Access Concentrator (see
WAN 2
WAN 1
Figure 2-5. Module LED Display
Figure
2-5).
Annunciator
Segment
Connection
LEDs
Module Status
LEDs
Network Status,
Alarm, and
Port Usage LEDs
WAN 2
WAN 2 Port
WAN 1
WAN 1 Port