I/O Installation Procedures; Table 14 - Connect Input/Output Wiring - Honeywell HC900 Installation And User Manual

Honeywell hc900 hybrid controller installation and user guide
Hide thumbs Also See for HC900:
Table of Contents

Advertisement

I/O Installation Procedures

Step
1
Using Rack #, Slot #,
Channel # data from a
Hybrid Control Designer
report and/or from
documentation aids in
Appendix A for reference,
fill in the tagnames on the
Label for each configured
I/O Module.
Be sure to use the
appropriate label for each
module type.
2
Place the appropriate label
supplied with the module
(tagname side out) into the
hinged door for each I/O
Module.
Slotted tabs, molded into
the door at top and bottom,
hold the label in place.
3
(Optional): Install jumper
combs into designated
Barrier style Terminal
Blocks, to reduce the
wiring required to supply
power:
Two-position jumper for
the DC Input Module
and/or on the DC Output
Module.
Ten-position jumper for
the AC Output Module.
Five-position jumper (10-
position jumper cut in half)
for a Relay Output
Module.
Revision 5
9/03

Table 14 - Connect Input/Output Wiring

Procedure
Refer to terminal block wiring diagrams for specific information.
HC900 Hybrid Controller Installation and User Guide
I/O Module Installation and Wiring - I/O Installation Procedures
Comments
Reference
.
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents