Honeywell HC900 Installation And User Manual page 66

Honeywell hc900 hybrid controller installation and user guide
Hide thumbs Also See for HC900:
Table of Contents

Advertisement

Installation Guide - Overview
Step
8
For each I/O expansion
rack (C50 CPU only), set
the Scanner Module
jumpers to the appropriate
Rack Address as shown at
right.
Repeat steps 1through 5 for
each I/O expansion rack
(C50 CPU only).
Then, for each expansion
rack, insert the Scanner
Module immediately to the
right of the Power Supply,
and secure it in place with
the two captured screws in
the faceplate.
56
Procedure
HC900 Hybrid Controller Installation and User Guide
Comments/References
Revision 5
9/03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents