NOTE 3: When clock source office signal is supplied via the line between the main site and the
remote site, set the SW1-1 and SW1-2 as the following table. In this case, DAID cards
(DAID0, DAID1) must be mounted in PIM0.
CONDITIONS
One DAID card
is provided.
Two or three
DAID cards are
provided.
NOTE 4: The time slot number 0 and 28 (TS0/28) cannot be used for control signal.
NOTE 5: This setting must be identical with the opposite DAIE card.
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 1.0
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
DAID0
DAID1
SW
SW
SW
1-1
1-2
1-1
ON
OFF
–
ON
OFF
OFF
DAID2
SW
SW
SW
1-2
1-1
1-2
–
–
–
ON
OFF
OFF
PN-DAID (DAI)
REMARKS
The clock signal is sent
to PLO0 of MP card via
supply route 0 (DAID0).
The clock signal supply
route is automatically
changed to the route 1
(DAID1), if a transmis-
sion line failure occurs
on the supply route 0.
Page 269