Omron E5CK User Manual page 127

Digital controller
Hide thumbs Also See for E5CK:
Table of Contents

Advertisement

APPENDIX
F Balanced Status
F Startup Conditions of DT
F Startup Conditions of HT
A--12
If the process value is within the stable range for 60s when there is no out-
put,it is deemed that the temperature is balanced.
(1) DT will start if the temperature that has been stable varies due to ex-
ternal disturbance and the deflection of the temperature exceeds the
stable range, and then the temperature becomes stable, provided that
the number of maximum temperature values is less than four.
(2) DT will start if the set point is changed under the condition that SRT
does not start and the temperature becomes stable, provided that the
number of maximum temperature values is less than four. If there are
four or more maximum temperature values, HT will start.
Temperature
SP
Extreme value 1
HT will be ON when there is hunting with four or more maximum temper-
ature values(extreme values) while SRT is not being executed.
Temperature
SP
Extreme
value 1
Note: In specific applications where temperature varies periodically due
to disturbance, internal parameters need to be adjusted.
Set point change
Extreme value 2
Extreme value 2
Extreme value 4
Extreme
value 3
Time
Time

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents