Inlet Manifold, Check Valve - Removal And Installation - Mira Extreme Thermostatic Installation And User Manual

Thermostatic power shower
Hide thumbs Also See for Extreme Thermostatic:
Table of Contents

Advertisement

5. Inlet Manifold, Check Valve – Removal and Installation
The following procedure can be applied for cleaning or renewing the inlet manifold,
inlet check valves or 'O' seals.
Warning! Before proceeding turn off the electrical and water supplies. The electricity
supply must be turned off at the mains and , if applicable, the appropriate circuit fuse
removed. Mains electrical connections are exposed when the cover is removed.
5.1 Remove the front cover, refer
to section: 'Maintenance, 3.
Front Cover – Removal and
Installation'.
5.2 Disconnect the electrical supply
cable from the terminal block.
5.3 Remove the flexible hose from the
appliance.
5.4 Remove the three wall fixing
screws.
5.5 Using the push-fit release tool,
push back and hold the collets from
the supply pipework, lift the Mira
Extreme from the wall to remove
the supply pipework from the inlet
manifold.
34

Advertisement

Table of Contents
loading

Table of Contents