5.6 Remove the screws securing the inlet
manifold and mixer assembly using
a T10 Torx screwdriver. Unclip the
pump transfer tube.
5.7 Remove the inlet manifold and mixer
assembly.
5.8 The ports adjacent to the mixer
assembly contain the inlet check
valves. The check valves can be
removed and replaced if required.
Make sure that the check valve is
inserted with the 'O' seal on the check
valve facing into the outlet port of the
manifold.
5.9 Inspect the inlet manifold/valve
i n t e r f a c e s e a l s a n d r e n e w i f
required.
Note! When refitting the inlet
manifold, lightly grease seals with a
silicone-based lubricant.
5.10 Refit components in reverse order.
5.11 Restore the water supplies and check
for any leaks.
5.12 Re-connect the cover electrical
connector and refit the cover. Secure
the cover by tightening the three
cover retaining screws. Refit the
temperature control knob.
5.13 Commission the shower, refer to
section: 'Commissioning'.
Inlet
Manifold
Inlet Manifold /
Mixer Assembly
Interface Seals
35
Transfer
Tube
Mixer
Assembly
Remove
Securing Screws
Ensure 'O'
seals face
the inlet
manifold
outlet ports
Inlet Manifold
Outlet Ports
Temperature
Control Knob

Advertisement

Table of Contents
loading

Table of Contents