Installation Diagrams - Mira Extreme Thermostatic Installation And User Manual

Thermostatic power shower
Hide thumbs Also See for Extreme Thermostatic:
Table of Contents

Advertisement

4. Installation Diagrams

To prevent operational difficulties, the feed from the cylinder should be as illustrated
below. Side entry cylinder bosses are not recommended because:
A drop in cylinder water level could expose a top entry immersion element if
fitted.
Air-in-water solution gathers at the edge of the cylinder and in the centre, during
the heating process before travelling up the vent.
25 mm
minimum
Minimum
1.0 m Head
Minimum
22 mm
Isolating Valve
A high level hot feed pipe run as illustrated below will result in air locking and should
be avoided.
Cistern
Other Cold
*
Draw Offs
*
A
Warning pipe
Cistern
Vent
Pipe
B
D.H.W.
60
C
Hot
o
Supply
Other Hot Draw Offs
Correct Installation
High-level
Hot Feed Pipe Run
Vent
*
Pipe
Side
D.H.W.
Entry
60
C
o
Boss
Other Hot
Draw Offs
Incorrect Installation
Minimum
80 mm Head
Hose
Retaining
Ring
Isolating Valves
missing
Hot
Supply
Cold
Supply
*
This layout is not suitable
for the Mira Extreme.
*Incorrect supply
connections
15
A
Warning pipe
Cylinder Feed
Cold Pump Feed
B
Vent
90
o
30
–60
o
o
Hose retaining
ring missing
Strained Hose

Advertisement

Table of Contents
loading

Table of Contents