(From previous page)
8 - 24
(To next page)
Setting of carry-over project
Select the project that carries over multiple
CPU setting and I/O assignment.
Click "Open".
When "OK" is selected, the multiple CPU setting and
the I/O assignment setting data are read from the
specified project and the data is overwritten.
Check the multiple CPU settings.
When changing a device in auto refresh setting,
select "Auto refresh" and input a device number to
be changed.
(Items with * should have the same settings for each
CPU module.)
After checking the multiple CPU settings or
completion of correction, select "END" and close the
multiple CPU setting window.