Mitsubishi Electric MELSEC Q Series User Manual page 249

Programmable controller multiple cpu system
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

(From previous page)
8 - 24
(To next page)
Setting of carry-over project
Select the project that carries over multiple
CPU setting and I/O assignment.
Click "Open".
When "OK" is selected, the multiple CPU setting and
the I/O assignment setting data are read from the
specified project and the data is overwritten.
Check the multiple CPU settings.
When changing a device in auto refresh setting,
select "Auto refresh" and input a device number to
be changed.
(Items with * should have the same settings for each
CPU module.)
After checking the multiple CPU settings or
completion of correction, select "END" and close the
multiple CPU setting window.

Advertisement

Table of Contents
loading

Table of Contents