Setting Up The New Carriage - Baby Lock Pro-Stitcher BLPS Instruction And Reference Manual

Table of Contents

Advertisement

Setting up the New Carriage

1.
With the Pro-Stitcher carriage set properly on
the frame system, untie the black twist ties that are
binding the black cables in a loop. Drape the black
cables over the back of the carriage as shown in
Figure 7.
2.
Plug one branch of the new "Y" power cord
(Page 3, I) into the power supply located toward the
rear of the carriage (Figure 8). Route the power cord
as shown in Figure 7. It is also permissible to have
the power cord extend directly out the side of the
carriage rather than over the top of the carriage.
3.
With the X-axis engagement lever shifted into the
lowest position, verify that the white gear at the front
of the carriage fully engages with the blue fl exirack
that was previously installed.
a. If the white gear fails to lower enough with the
front disengagement lever in its lowest position, you
will need to adjust the black X-axis lever bracket to
allow the X-axis engagement lever to drop a little
lower. To do this, loosen the two 4mm Allen bolts
and pivot the bracket downward until the white gear
is pressing fi rmly on the blue fl exirack, then re-tight-
en the two bolts (Figure 9).
"Y" power cord
Back of Carriage
Figure 7
Plug
Figure 8
Adjust only
if necessary
Figure 9
Page 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents