Two-Stage IP403 Upgrades

Due to the need to adjust internal memory allocation, at certain critical points IP403 Control Units have to
perform a two stage upgrade process.
Upgrading to levels between 2.0 and 2.1(27) inclusive.
In this scenario, the IP403 must first be upgraded to level 1.99. Once upgrade to 1.99, the unit can be
further upgraded to levels from 2.0. This is a one-time process that does not need to be repeated.
Upgrading to 2.1(28) or higher.
In this scenario, the IP403 must first be upgraded to level 2.99. Once upgraded to 2.99, the unit can be
further upgraded to level from 2.1(28) or higher. This is a one-time process that does not need to be
repeated.
IP403 Two-Stage Upgrade Process
1. Run the existing Manager that matches the system's current software level and receive a copy of
the configuration from the system.
2. Remove the existing IP Office suite, see Removing Existing IP Office Suite.
3. Insert the Administration CD containing the new software Level upgrade to be installed and install
the new software suite. Perform Installing the IP Office Software Suite.
4. Start Manager. Select File | Advanced | Upgrade.
5. The upgrade wizard will list the units found, their current software level and software levels for
those units Manager has available.
6. Right-click on the upgrade wizard and click Select Directory.
If upgrading to between 2.0 and 2.1(27) inclusive, select the IP403V1_99 folder within the
Manager program directory.
If upgrading to level 2.1(28) or higher, select IP403V2_99 the folder within the Manager
program directory.
7. The upgrade wizard should now list just the IP403 control unit as having upgrade software
available.
8. If upgrading from pre- 2.1 software, untick Validate and see the note below.
The validated upgrade option is only supported for units which already have 2.1 or higher
software installed. If doing an unvalidated upgrade, you must be using a PC with a fixed IP
address and on the same LAN segment as the IP Office control unit.
9. Tick the checkbox next to the IP403 unit name and then click Upgrade.
10. Enter the system password when requested.
11. Following the upgrade, stop and restart the upgrade wizard. The upgrade wizard will again show
the software levels available in the Manager program folder and allow all the units in the system
to be upgraded.
Installation Manual
IP Office 3.0
40DHB0002UKCL Issue 12c (24th February 2005)
Basic System Programming
Page 55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip403 officeIp406 office v2Ip412 office

Table of Contents