Extreme Networks BlackDiamond X8 Series Hardware Installation Manual page 89

Hide thumbs Also See for BlackDiamond X8 Series:
Table of Contents

Advertisement

Assemble the Shipping Container
Once the chassis is removed, assemble the shipping container around it.
1
At each corner, attach a restraining bolt to the shipping bracket, securing the chassis to the shipping
pallet.
Figure 69: Recrating the BlackDiamond X8 Chassis
2 Put the lower foam cushion around the base of the chassis and set the upper foam cap on top of the
chassis.
Figure 70: Placing the Foam Cushioning Around the Chassis
BlackDiamond X8 Series Switches Hardware Installation Manual
BlackDiamond X8 Maintenance Procedures
89

Advertisement

Table of Contents
loading

Table of Contents