Extreme Networks BlackDiamond X8 Series Hardware Installation Manual page 64

Hide thumbs Also See for BlackDiamond X8 Series:
Table of Contents

Advertisement

6 Slide the power supply into the chassis until the lever starts to engage.
Figure 41: Installing a Power Supply
7 Rotate the lever toward the front of the power supply to fully seat the power supply in the chassis.
8 Replace the power supply ventilation cover.
a Set the lower edge of the cover in place so that the tabs on the edge fit into the matching slots
in the chassis frame.
b Rotate the top of the cover into place against the front of the chassis frame.
BlackDiamond X8 Series Switches Hardware Installation Manual
BlackDiamond X8 Maintenance Procedures
64

Advertisement

Table of Contents
loading

Table of Contents