RIGID PIPE VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations , using two 90
Rigid Pipe vent systems for Propane and Natural Gas.
FPI P36-3 Zero Clearance Direct Vent Gas Fireplace
(Propane & Natural Gas)
INSTALLATION
•
Vent must be supported at offsets.
•
Firestops are required at each floor level and
whenever passing through a wall.
•
Maintain clearances to combustibles.
Note: Must use optional rigid pipe adaptor when
using rigid pipe vent systems (Part # 510-994).
o
elbow, with
27