PALACE SERIES OPTIONS
THE KENSINGTON, WESTMINSTER & BALMORAL FRONT
3-PANEL DOOR INSTALLATION
1) Install sub-frame by hooking top over glass door, push in bottom of
2) Mount 3-panel door frame to flange on sub-frame, ensuring to line-
frame and secure with 2 screws.
up holes. Secure using the 4 screws provided.
Sub-Frame
Secure bottom of
sub-frame with
screws.
FPI P36-3 Zero Clearance Direct Vent Gas Fireplace
65