Control Unit - Duerkopp Adler 558 Operating Instructions Manual

Double chain stitch buttonhole machine
Table of Contents

Advertisement

5.6.3 Control Unit

Mount the control unit 2 under the table.
Lay the cable 1 from the wiring distributor to the control unit 2 (plug b10) and aatch
to the table with a clamp.
The laying of the cable must be conducted with the machine head tilted up.
Connect the mains lead and connector lead to the motor as per the hook-up
diagram.
ATTENTION
After connecting the sewing procfedure may only be turned
on if all setting have previously been made according to
Chapter 5.5.
1
2
101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents