Synchronization Of Port Roles - Cisco 2950 - Catalyst Switch Configuration Manual

Software configuration guide
Hide thumbs Also See for 2950 - Catalyst Switch:
Table of Contents

Advertisement

Understanding RSTP
Figure 15-2 Proposal and Agreement Handshaking for Rapid Convergence
Switch A
DP = designated port
RP = root port
F = forwarding

Synchronization of Port Roles

When the switch receives a proposal message on one of its ports and that port is selected as the new root
port, the RSTP forces all other ports to synchronize with the new root information.
The switch is synchronized with superior root information received on the root port if all other ports are
synchronized. An individual port on the switch is synchronized if
If a designated port is in the forwarding state and is not configured as an edge port, it transitions to the
blocking state when the RSTP forces it to synchronize with new root information. In general, when the
RSTP forces a port to synchronize with root information and the port does not satisfy any of the above
conditions, its port state is set to blocking.
After ensuring all of the ports are synchronized, the switch sends an agreement message to the designated
switch corresponding to its root port. When the switches connected by a point-to-point link are in agreement
about their port roles, the RSTP immediately transitions the port states to forwarding. The sequence of events
is shown in
Catalyst 2950 and Catalyst 2955 Switch Software Configuration Guide
15-8
The switch determines the link type from the port duplex mode: a full-duplex port is considered to
have a point-to-point connection; a half-duplex port is considered to have a shared connection. You
can override the default setting that is determined by the duplex setting by using the spanning-tree
link-type interface configuration command.
Proposal
Root
Agreement
F
DP
RP
Root
F
DP
RP
Root
F
DP
RP
That port is in the blocking state
It is an edge port (a port configured to be at the edge of the network)
Figure
15-3.
Switch B
Designated
switch
F
Designated
switch
Proposal
F
Designated
switch
Agreement
F
F
DP
Chapter 15
Switch C
F
RP
Configuring MSTP
78-11380-10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 2955

Table of Contents