Operation at Startup
This section shows the Controller's operation when it is powered ON in the RUN mode.
The following describes the order in which signals change.
OFF
POWER
ON
OFF
ENABLE
ON
OFF
RUN
ON
OFF
DO
ON
OFF
OR
ON
OFF
ERROR
ON
T1:
Startup
processing
power ON
T2:
RUN mode initialization
processing
Explanation of operation
(1) The RUN signal turns ON when the startup process is completed after the Controller is powered ON in the
RUN mode.
(2) When the RUN signal turns ON, initialization processing in the RUN mode is performed. When the
initialization processing is completed, the ENABLE signal turns ON and command inputs can be accepted.
(3) The ENABLE signal turns OFF when the Controller accepts command and stays OFF during processing
commands.
(4) The signal turns ON/OFF after output of data such as measurement results.
Reset Input
Set the RESET signal to ON for at least 10 ms.
174
Timing Charts
The time required changes according to the settings.
at
The time required changes according to the settings.
An error
Recovered
occurs
from an error
ZFX-C User's Manual