Omron GRT1-PNT - DATASHEET 2 Operation Manual page 51

Profinet io communication unit
Table of Contents

Advertisement

Installation of Configuration Software
Updating the Device
Catalogue
Note
Pressing the Next button will start the installation.
4 When done, the installation program will notify the user of its completion.
The update of the Device Catalogue of the FDT Container is required
After installation of the GRT1-PNT DTM the Device Catalogue in the FDT
Container needs to be updated, to show the new GRT1-PNT DTM in the list of
available devices. For CX-ConfiguratorFDT the following procedure applies.
1,2,3...
1 Open the Device Catalogue window in CX-ConfiguratorFDT.
2 Press the Update button to initiate the update sequence.
After updating, the GRT1-PNT DTM will be shown in the list of available
devices. It can now be used to setup a PROFINET IO network and configure
the Controller Unit.
In case the required PROFINET IO Controller DTM has not been installed, this needs
to be done first to allow the full features of the GRT1-PNT DTM to be used.
Section 2-6
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Profinet ioGrtsmartslice grt1-seriesGrt1-pnt

Table of Contents