GE Innova 2100-IQ Preinstallation Manual page 232

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Illustration 6-42:
b. Remove the protection panel (
c. Remove the metallic window
d. The power cable shall enter the UPS by the bottom right hand side entry:
i.
Remove RHS UPS cover (remove two top screws make two bottom screws loose),
ii. Remove bottom cover plate.
232
,
Illustration
6-42).
from the protection panel
20 PIST0021 - US Fluoro UPS and PDB connection
Direction 5160944-13-1EN, Revision 2
(Illustration
6-42).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents