GE Innova 2100-IQ Preinstallation Manual page 182

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Power supply and ground cables provided by the customer shall be compliant with local
regulations (UL, CSA, IEC, CCC).
Power supply and ground cables must be CCC certified and labeled for installation in China.
Reference: For specific Vascular system grounding maps and connection details, refer to the
MisMap and mis chart listed in
182
Section 15, MIS (Master Interconnect
Direction 5160944-13-1EN, Revision 2
System).
4 Power and Grounding Requirements

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents