Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
•
Power supply and ground cables provided by the customer shall be compliant with local
regulations (UL, CSA, IEC, CCC).
•
Power supply and ground cables must be CCC certified and labeled for installation in China.
Reference: For specific Vascular system grounding maps and connection details, refer to the
MisMap and mis chart listed in
182
Section 15, MIS (Master Interconnect
Direction 5160944-13-1EN, Revision 2
System).
4 Power and Grounding Requirements